International technology firm Microsoft have recently moved into their brand-new office located in Leopardstown. SAS International designed and manufactured a range of metal ceilings and bespoke metalwork installed in the multi award-winning innovation hub. This modern office signifies the celebration of an extensive 30-year history Microsoft share with Ireland.
SAS500 linear baffles were supplied in either RAL 9016 (Black) or in a pre-coat timber effect to enhance the natural, organic character of this project. Installed in the main office areas, galvanised SAS130 T-Grid in RAL 9016 was chosen for its industrial demeanour and sharp appearance.
SAS330 C-Profiles have also been supplied in a pre-coat timber effect, achieving the popular timber natural impression while still providing the longevity and benefits of metal. Installed in a unique triangular grid pattern, this ceiling adheres to the contemporary aesthetic of an exposed ceiling.
The new building has been designed with the 2,000 Microsoft employees needs in mind creating large open spaces with the aim to promote engagement amongst colleagues.
SAS International achieved the artistic vision of RKD architects through the collaboration with BAM and Platt & Reilly.
Commercial
Microsoft
RKD Architect
BAM
Platt & Reilly
2018
Ireland