aluminium open cell ceiling

Notes

SAS Emac hangers must be used in conjunction with Emac hanger brackets for intallations at 1500mm centres max.

Emac hangers should be installed a maximum of 300mm from the edge of the system. Where two main runners are clipped together, an Emac hanger should be installed within 300mm.

It is considered good practice to stagger joints in supporting structures.

Additional Loads

The Trucell system can support additional loads such as services up to a limit of 3kg. This limit is based on a point or uniformly distributed load over over 0.36m_, positioned a minimum of 1000mm apart.

Trucell panels can be pre-ordered with enlarged cells to accept luminaire trays, supplied by either the luminaire manufacturer or SAS International.

For further advice please contact the SAS technical department.
 

 

 

System Trucell Isometric Drawing Thumb

 

 

 

  

View on underside of panel with luminaire tray

Trucell Panel 01

award sponsor

bco-logo2013 (170 x 170)
Pleased to be sponsoring
'Fit out of Workplace' award

world-class interiors

corporate (170 x 104)
Watch our new corporate video or download a copy of the brochure.

find us on

Tweet (30 x 30) linkedin (30 x 30) Fb (30 x 30) youtube (30 x 30) plus-badge

career opportunites

Current career opportunities within SAS

register for updates

Please enter your email address below to register for updates