Installation
| All SAS ceilings should be installed in accordance with: BS EN 13964:2004 Suspended ceilings, Requirements and test methods. AIS (Association of Interiors Specialists) Guide No.1, Good Practice For The Installation Of Suspended ceilings. Installation time can be reduced on-site by utilising Emac hangers from the ceiling soffit, (see types of metal ceilings - suspension for further details). Due to the durability of metal ceiling tiles, damage occurred during transit, installation of the ceiling and the installation and commissioning of services is minimal. On-site installation time can be reduced and controlled using many different logistic options. These can include: 1) Factory formed apertures for lighting and other services. 2) Prefabrication of M&E services, reducing on-site installation time. 3) Deliveries in accordance with BREEAM requirements, delivery pallets can be collected and reused for the next delivery. 4) For larger projects and those that roll out nationally it is possible to arrange storage and/or call-offs for individual sites or build stages. SAS International works and maintains contact with main and sub contractors to ensure that all elements of the delivery requirements are met. If you require further information please contact our dedicated sales order processing department. |
award sponsor
Pleased to be sponsoring
'Fit out of Workplace' award
career opportunites
Current career opportunities within SAS
register for updates
